The PLC program to control the sequence of related mechanical and electrical components, complete the cleaning, filling and CIP actions, to achieve the beer barrel cleaning, filling beer and cleaning and emptying the filling pipeline functions.workstations, lines and valves are stainless steel, and all lines and pneumatic systems are closed loop. After strict design and production process control, the equipment reflects the exquisite appearance and has a stable working performance.Stations of cleaning, waiting and filling, and two stations of cleaning and filling are controlled separately. The waiting station is equipped with a drum. With manual assistance, it can quickly move from the cleaning station to the filling station, saving time and labor.
Nominal Production Capacity |
5000 Bottles/Hour |
Transport Package |
Wooden |
Filling Principle |
Isobaric |
Dosing Device |
Exhaust Nozzle |
Power |
800w |
Steam high temperature sterilization; Internal and external cleaning and disinfection of wine grass; CO2 purge, backup pressure, discharge;
Ø Filling process flow meter automatically measures filling, reliable preparation; And preset different specifications bucket type, quick selection.
Ø Equipped with pipeline air tightness detection, residual liquid detection, pressure detection, water temperature, steam temperature, wine temperature detection, lye concentration detection;
Ø Each test value unqualified automatic stop and the touch screen alarm prompts the fault cause.
Ø Each pressure value, filling flow, wine temperature touch screen real-time display, the number of barrels accumulated.
Ø Three water tanks: hot alkali tank, hot water tank, mixed water tank. The hot soda tank and hot water tank are steam heated and equipped with a thermostat, which can also be turned off separately on the touch screen.
Ø The process parameters are controlled by Siemens PLC, with color touch screen, can be adjusted by the technician.
FAQ
Q:How many years of experience in brewing equipment do you have?
A: We have more than 20 years in brewing and beer filling equipment.
Q: Where is your factory located?
A: Our factory is located in New Town, Jiyang Zone, Jinan, Shandong, China, 2 hours high speed train to Beijing.
Q: How could we confirm the details of the products?
A: We will provide all the drawings for you to confirm before production.
Q: How long the warranty will be?
A: 3 years warranty for the whole tank and the main equipment, 1 year for the accessories and auxiliaries.
Q: How about the installation?
A: We can supply the installation. There are two options. The first option: We could appoint our engineer to your company to debug and repair, as for the cost of this trip such as ticket, visa, accommodation and labor cost shall be on your side. The second option: On-line service will be provided. If still under guarantee period, the necessary accessories and parts will be provided free, the buyer afford the transportation cost.
Q: How do you guarantee the filling machine operation?
A: Before the delivery, we will test and debug all machines in good condition and record the video for your checking.